摘要
结合工程实际对工程施工各阶段容易受到的气象条件影响的程度进行了分析,统计了工程所在地区工期内不利气象条件出现的频率,并将实际施工进度与进度计进行对比。通过定义各种不利气象条件对各施工阶段的影响因子和计算期间受气象条件的影响系数来直观表现不利气象条件对工程进度的影响程度,以便根据气象条件合理安排各项施工时间,优化施工进度,提高从业人员对气象条件的考虑。
Combined with the engineering practice,the influence degree of meteorological conditions on each stage of engineering construction is analyzed,the frequency of adverse meteorological conditions in the area where the project is located is counted,and the actual construction progress is compared with the progress schedule.By defining the impact factors of various adverse meteorological conditions on each construction stage and calculating the impact coefficient of meteorological conditions during the calculation period,the impact degree of adverse meteorological conditions on the project progress can be visually displayed,so as to reasonably arrange the construction time according to the meteorological conditions,optimize the construction progress and improve the consideration of employees for meteorological conditions.
作者
徐大为
张志敏
潘峰
XU Dawei;ZHANG Zhimin;PAN Feng(Shanghai Construction No.5(Group)Co.,Ltd.,Shanghai 200063,China)
出处
《建筑施工》
2023年第9期1943-1945,共3页
Building Construction
基金
上海市科学技术委员会科研项目课题(19DZ1201403)。
关键词
气象条件
不利影响
施工进度
工程措施
meteorological conditions
adverse effects
construction schedule
engineering measures