大井径原井位延伸凿井设备的布设与应用

Layout and Application of Shaft Sinking Equipment for Extension of Large-diameter Original Shaft Position
下载PDF
导出
摘要 结合金属矿山盲竖井项目设计经验,以某大型铁矿二期扩建工程主副井延伸为例,对原有传统施工技术进行优化,在确保符合施工标准的前提下,减少竖井施工难度,降低成本,保证施工安全可靠。 With the experience in design of interior shaft project of metal mine and taking the main and auxiliary shaft extension of the second phase expansion project of a large iron mine as an example,the original traditional construction technology was optimized to reduce the difficulty of shaft construction,reduce the cost and ensure the safety and reliability of construction under the premise of meeting the construction standards.
作者 韦常胜 李耀宗 徐胜亮 冯新奇 张家豪 WEI Changsheng;LI Zongyao;XU Shengliang;FENG Xinqi;ZHANG Jiahao(Xingshan Iron Ore Mine of the Mining Company,Shougang Group Co.,Ltd.,Qian’an 064400,China)
出处 《矿业工程》 CAS 2023年第5期26-28,共3页 Mining Engineering
关键词 原井位延伸 盲竖井 深部开采 井筒施工 天轮平台 extension of original shaft position interior shaft deep mining pitshaft construction sheave wheel platform
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部