北京大兴国际机场(廊坊)临空经济区某大型会展中心高品质施工管理措施

High-quality Construction Management Measures for a Large Exhibition Center in Airport Economic Zone of Beijing Daxing International Airport(Langfang)
下载PDF
导出
摘要 伴随着技术和科技的创新,建筑行业已经从传统、单一、粗放的施工作业理念转变为追求节能、高效、全方位效益兼顾的集约化时代。本文对北京大兴国际机场(廊坊)临空经济区某大型会展工程超大空间、高空作业、交叉施工、工期超短等难点进行分析,通过创新组织管理和行之有效的解决办法和保障措施,保证项目按期、高质量交付使用,做到了超短工期与高品质施工的同频双赢。 With the innovation of science and technology,the construction industry has transformed from a traditional,single,and extensive construction concept to an intensive era that pursues energy conservation,efficiency,and comprehensive benefits.This article analyzes the difficulties of a large exhibition project in the airport economic zone of Beijing Daxing International Airport(Langfang),including super-large space,aloft work,cross construction,and short construction period.Through innovative organizational management as well as effective solutions and guarantee measures,the project is ensured to be delivered and used on time and with high quality,achieving a win-win situation of both short construction period and high-quality construction at the same frequency.
作者 张洋 Zhang Yang(Beijing Gangyuan Architectural Decoration Engineering Co.,Ltd.,Beijing,102211)
出处 《建设科技》 2023年第17期63-65,81,共4页 Construction Science and Technology
关键词 超大空间 交叉施工 施工部署 保障措施 super-large space cross construction construction deployment protection measures
  • 相关文献

参考文献1

二级参考文献6

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部