渔港项目超概算原因及对策研究

Study on the Reasons and Countermeasures of Overbudget of Fishing Port Project
下载PDF
导出
摘要 针对渔港项目超概算现象,从法律法规层面出发,结合项目建设基本流程,对渔港项目超概算问题进行深入分析,提出了超概算问题的预防与解决之策。研究表明:重视项目立项决策工作、加强设计阶段的造价控制及施工阶段的成本控制,是渔港项目超概算问题的预防之策,而解决之策得从法律法规层面着手。 In the light of the phenomenon of overbudget of fishing port project,this paper,starting from the level of laws and regulations,analyzes the problem of overbudget of fishing port project combined with the basic process of project construction,puts forward the prevention and solution of the problem of over budget.The results show that it is a preventive measure to pay attention to the decision-making work of project establishment,to strengthen the cost control in the design stage and the cost control in the construction stage,and the solution must start from thelevel of laws and regulations.
作者 肖天葆 徐佳 XIAO Tian-bao;XU Jia(Guangdong Maoming Binhai New Area Administrative Committee,Maoming 525000,China;MaomingPortGroupCo.Ltd.,Maoming525000,China)
出处 《工程建设与设计》 2023年第17期266-268,共3页 Construction & Design for Engineering
关键词 渔港项目 政府投资 超概算 成本控制 fishing port project government investment over estimate cost control
  • 相关文献

参考文献8

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部