3Hansen R, Wecker G. Method of deforming an initial pipe hav- ing a circular cross - section into a U shaped and device for carry- ing out the method [ P]. US: 6119501, 2000 -09 - 19.
4Kim S H. Tool design for the tubular press forming of a rear sus- pension member with the finite element analysis [ J ]. Journal of Materials Processing Technology, 2007, 192 - 193:181 - 187.
5Yoon S J, Park J K, Lee M J, et al. Deformation during hot stamping process of tubular beam [ A ]. Proceedings of the 5th In- ternational Conference on Tube Hydroforming [ C ]. Noboribetsu : 2011.
6Lee G D. Hot forming and IN - SITU cooling of metallic articles [ P]. US: 0289393, 2008 - 11 -27.
7Lee K T, Back H J. Tube hydrofomling process design of lursion beam type rear suspension considering durability [ J ]. Interna- tional Journal of Modem Physics B, 2008, 22 ( 31 - 32 ) : 6199 - 6205.