摘要
紧凑型线路导线覆冰脱落往往会引发相间及相地闪络跳闸、导地线断股、断线等,为反演故障过程,指导紧凑型线路防冰加固设计及改造,以某500 kV紧凑型线路脱冰跳跃相间闪络跳闸故障为研究案例,基于ANSYS软件建立覆冰导线-绝缘子-相间间隔棒体系的有限元模型,模拟4种脱冰工况,分析不同工况下导线脱冰振动响应,得到导线在脱冰过程中相间间隙和相间间隔棒轴力的变化规律。
To reverse the fault process and guide the antiicing reinforcement design and reconstruction of compact lines,a finite element model of iced conductor-insulator-interphase spacer system is established based on ANSYS software to simulate four deicing conditions.The vibration response of conductor deicing under different working conditions is analyzed,and the variation rules of inter-phase clearance and inter-phase spacer axial force in the process of conductor deicing are obtained.
作者
潘浩
黄增浩
邓展豪
周仿荣
李昊
袁齐坤
覃甘简
PAN Hao;HUANG Zenghao;DENG Zhanhao;ZHOU Fangrong;LI Hao;YUAN Qikun;QIN Ganjian(Joint Laboratory of Power Remote Sensing Technology,Electric Power Research Institute of Yunnan Power Grid Company Ltd.,Kunming 650217,Yunnan,China;Electric Power Research Institute of China Southern Power Grid,Guangzhou 510663,Guangdong,China;Qujing Power Supply Bureau of Yunnan Power Grid Company Ltd.,Qujing 655000,Yunnan,China)
出处
《电网与清洁能源》
CSCD
北大核心
2023年第9期74-80,90,共8页
Power System and Clean Energy
基金
中国南方电网有限责任公司科技项目(YNKJXM20210174)。
关键词
紧凑型输电线路
脱冰跳闸
脱冰振动
相间间隙
compact transmission line
ice-shedding trip
ice-shedding vibration
interphase gap