三钢动力厂二泵站工业净水处理系统工艺落后、设备陈旧,无污泥处理设施,为改进工艺满足生产用水需求,需对该系统进行升级改造。介绍了钢铁厂工业净水处理系统升级改造具体方案及成效。
According to the current situation of the industrial water purification and treatment system of the second pumping station of Sansteel's power plant which has outdated technology,obsolete equipment and no sludge treatment facilities,the production water demand is analyzed,and the specific plan and effectiveness of upgrading the industrial water purification and treatment system of the iron and steel plant are introduced.
作者
李海松
LI Haisong(Fujian Sansteel Minguang Co.,Ltd.,Sanming,Fujian 365000,China)
出处
《冶金动力》
2023年第5期70-72,77,共4页
Metallurgical Power
关键词
工业净水处理
高密度沉淀池
污泥处理
industrial water purification
high-density sedimentation tanks
sludge treatment