期刊文献+

唐钢2号高炉高比例球团冶炼攻关实践

Practice of High-Proportion Pelletizing in No.2 Blast Furnace of Tangsteel
下载PDF
导出
摘要 唐钢2号高炉开炉以来配合环保政策要求,通过采取提高高炉原燃料质量、优化高炉工艺操作、高风温大富氧以及低硅冶炼等技术措施,在保证高炉高产低耗的前提下,2号高炉球团矿入炉比例由开炉时的20%逐步稳定在40%左右。 Since the opening of No.2 blast furnace in Tangsteel with the requirements of environmental protection policy,through adopting technical measures such as improving the raw fuel quality of the blast furnace,optimizing the process operation of the blast furnace,high air temperature,high oxygen enrichment and low silicon smelting,under the premise of ensuring the high yield and low consumption of the blast furnace,the proportion of pellets in the No.2 blast furnace has gradually stabilized from 20%at the opening time to about 40%.
作者 袁雪涛 李秀兵 客海滨 YUAN Xuetao;LI Xiubing;KE Haibin(HBIS Group Tangsteel Company,Tangshan063000,China;Hebei Tianzhu Iron and Steel Group Co.Ltd.,Tangshan063000,China)
出处 《甘肃冶金》 2023年第5期31-33,共3页 Gansu Metallurgy
关键词 高炉 高比例球团 低硅冶炼 blast furnace high proportion pellets low silicon smelting
  • 相关文献

参考文献7

二级参考文献59

共引文献50

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部