白洋淀流域某污水处理厂深度除磷运行效果分析 被引量:1

Analysis of the Operation Effect of Deep Phosphorus Removal in a Sewage Treatment Plant in the Baiyangdian Basin
下载PDF
导出
摘要 为实现深度除磷,以白洋淀流域某污水处理厂为研究对象,通过长期现场检测该厂不同工艺段TP变化,分析各工艺段的除磷效果以及除磷技术的制约因素。结果表明:在一般情况下,依靠生物池化学强化生物除磷和后置磁混凝化学除磷等工艺耦合除磷,可实现出水TP≤0.2mg/L。 To achieve deep phosphorus removal,a sewage treatment plant in the Baiyangdian Basin was taken as the research object.Through long-term on-site monitoring of TP changes in different process stages of the plant,the phosphorus removal effect of each process stage and the con-straints of phosphorus removal technology were analyzed.The results indicate that in general,coupling processes such as chemical enhanced biologi-cal phosphorus removal in biological ponds and post magnetic coagulation chemical phosphorus removal can achieve effluent TP≤0.2 mg/L.
作者 刘伟 秦春雷 朱树新 赵洪伟 Liu Wei;Qin Chunlei;Zhu Shuxin;Zhao Hongwei(Lugang Sewage Treatment Plant of Baoding Drainage Service Center,Hebei,071000)
出处 《当代化工研究》 CAS 2023年第19期90-92,共3页 Modern Chemical Research
关键词 污水处理厂 生物除磷 化学除磷 有机磷 sewage treatment plant biological phosphorus removal chemical phosphorus removal organic phosphorus
  • 相关文献

参考文献5

二级参考文献26

  • 1王佳伟,张道友,卢爱国,常江,甘一萍,周军.利用活性初沉池提高生物脱氮除磷能力的研究[J].给水排水,2011,37(S1):78-81. 被引量:2
  • 2曹雪梅,彭永臻,王淑莹.缺氧区、好氧区容积比对A^2/O工艺反硝化除磷的影响[J].中国给水排水,2007,23(3):27-30. 被引量:13
  • 3国家环境保护总局.水和废水监测委员会主编水和废水监测方法.第4版.北京:中国环境科学出版社,2002.
  • 4于莉芳.污泥水富集硝化菌添加强化污水处理系统硝化的试验研究:[学位论文].西安:西安建筑科技大学,2006.
  • 5GB3838-2002.地表水环境质量标准.[S].国家环境保护总局,国家质量监督检验检疫总局,..
  • 6GB 18918-2002城镇污水处理厂污染物排放标准
  • 7Kermani M, Bina B, Movahedian H, et al. Application of moving bed biofilm process for biological organics and nu- trients removal from municipal wastewaster[ J ]. Am J En- viron Sci,2008,4(6) :682 - 689.
  • 8Weiss J S,Alvarez M,Chi-Chung Tang C C,et al. Evalu- ation of moving bed biofilm reactor technology for enhan- cing nitrogen removal in a stabilizantion pond treatment plant [ A ]. Proceedings of the Water Environment Federa- tion [ C ]. USA : WEF,2005.
  • 9Kermani M, Bina B, Movahedian H,et al. Biological phosphorus and nitrogen removal from wastewater using moving bed biofilm process[ J]. Iran J Biotechnol,2009, 7(1) :19 -27,61.
  • 10黄宁俊,王社平,王小林,李建洋,刘丹松,郑宁,杜锐,王建军.西安市第四污水处理厂工艺设计介绍[J].给水排水,2007,33(11):27-31. 被引量:4