山岭重丘区预制梁场建设技术应用分析 被引量:1

Application Analysis of the Construction Technology of Prefabricated Beam Yard in Mountainous and Hilly Area
下载PDF
导出
摘要 针对山岭重丘区地形复杂、土方超挖问题,提出增加制梁区高度、调整加工钢筋、在桥梁沿线增设吊装区的解决思路,解决了工期短、建设成本高的问题,实现了对施工量的准确把握。同时,分析了制梁场场地选择、施工流程调整,以及施工要点等内容。 In view of the complicated terrain and overexcavation in mountainous and hilly areas, this paper puts forward the solution of increasing the height of the beam making area, adjusting the processing steel bars, and adding the hoisting area along the bridge, which solves the problems of short construction period and high construction cost, and realizes the accurate grasp of the construction amount. At the same time,the selection, the adjustment of construction process and the key points of construction of beam making yard are analyzed.
作者 马威武 蒯强 单武林 MAWei-wu;KUAI Qiang;SHANWu-lin(The Civil Engineering Group Corporation Ltd.of China Construction Second Engineering Bureau,Foshan 528010,China)
出处 《工程建设与设计》 2023年第19期170-172,共3页 Construction & Design for Engineering
关键词 预制梁场 山岭重丘区 BIM技术 龙门吊 prefabricated beam yard mountain heavy hilly area BIM technology gantry crane
  • 相关文献

参考文献4

二级参考文献12

共引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部