主题乐园供配电负荷计算需要系数选取的研究分析

Research and Analysis on the Selection of Power Supply and Distribution Demand Factors for Theme Park Load Calculation
下载PDF
导出
摘要 为给后期主题乐园的设计提供参考依据,制定更加经济合理的方案,以方特济宁复兴之路文化科技项目为例,主要从负荷等级、供配电系统等方面介绍大型主题乐园的电气设计;通过对案例运营数据的收集和分析,重点阐述主题乐园的负荷计算以及如何合理地选取餐厅和游乐设备需要系数。 To provide a reference basis for the design of later theme parks and develop more economical and reasonable plans,taking the Fuxing Road Cultural and Technological Project of Fangte Jining as an example,the electrical design of large theme parks is mainly introduced from the aspects of load level,power supply and distribution system,etc;Through the collection and analysis of operational data,the focus is on the load calculation of theme parks and how to reasonably select the coefficient of demand for restaurants and amusement equipment.
作者 熊正友 Xiong Zhengyou(Fantawild Institute of Design,Shenzhen,Guangdong 518000)
出处 《现代工程科技》 2023年第15期86-88,共3页 Modern Engineering Technology
关键词 供配电系统 主题乐园 工艺配电 需要系数 计算负荷 power supply and distribution system theme park process power distribution demand coefficient calculate the load
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部