摘要
针对长距离TBM隧洞衬砌分布不均且不连续、全断面衬砌和非衬砌段交错布置、全断面衬砌断面类型衬砌厚度不一的特点,对全线TBM隧洞衬砌进行衬砌分区;同时合理规划布置运输通道,便于施工资源人、材、机的投入,大大加快了TBM衬砌施工进度。
Long distance TBM tunnels have the characteristics of uneven and discontinuous lining distribution,staggered arrangement of full section lining and unlined sections,and varying lining thickness of full section lining section types.This paper conducts lining zoning for the TBM tunnel lining along the entire line,while reasonably planning and arranging transportation channels.It facilitates the investment of construction resources,personnel,materials,and machinery,greatly accelerating the progress of TBM lining construction.
作者
段任荣
王耀毅
尚书毫
田冬冬
DUAN Ren-rong;WANG Yao-yi;SHANG Shu-hao;TIAN Dong-dong(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
出处
《云南水力发电》
2023年第10期233-236,共4页
Yunnan Water Power
关键词
TBM隧洞
衬砌分区
运输通道
规划布置
TBM tunnel
lining zoning
transportation channel
planning and layout