摘要
杨梅水库在长期运行过程中,大坝各部位出现了坝坡受损、护坡塌陷、局部渗漏等一系列问题,急需进行除险加固以避免影响周边人民的生命财产安全。对杨梅水库工程现状及主坝现存问题进行了详细分析,通过对比研究的方式分析了利用塑性混凝土防渗墙解决水库坝体渗漏问题的优势,结合现场工程地质等参数对塑性混凝土防渗墙除险加固后工程的安全状况进行了复核计算,为工程施工提供参考。
During the long-term operation of Yangmei Reservoir,various parts of the dam have encountered a series of problems such as damage to the dam slope,collapse of the slope protection,and local leakage.It is urgent to carry out risk removal and reinforcement to avoid affecting the safety of the surrounding people's lives and property.This article provides a detailed analysis of the current situation of the Yangmei Reservoir project and the existing problems of the main dam.Through comparative research,the advantages of using plastic concrete antiseepage walls to solve the leakage problem of reservoir dams are analyzed.Combined with on-site engineering geological and other parameters,the safety status of the reinforced plastic concrete anti-seepage wall project is rechecked and calculated,providing reference for engineering construction.
作者
邓怀初
DENG Huai-chu(Zhaoqing Gaoyao District Water Conservancy Engineering Construction Management Center,Zhaoqing 526000,China)
出处
《云南水力发电》
2023年第10期335-338,共4页
Yunnan Water Power
关键词
塑性混凝土
除险加固
杨梅水库
plastic concrete
risk removal and reinforcement
Yangmei Reservoir