摘要
大型原位试验需对岩体或试验对象施加竖向荷载,以得到岩体力学参数。竖向荷载由竖向反力装置提供,常用的竖向反力装置有压重(堆载)平台和锚桩反力装置。以天水曲溪城乡供水工程为例,其水库坝基岩体变形试验和抗剪试验利用地锚施加竖向反力,验证了水泥砂浆锚固钢筋作为反力装置的适用性和可行性,为类似工程及试验提供参考和依据。
Large in-situ tests require applying vertical loads to the rock mass or the test object to obtain mechanical parameters.The vertical load is provided by vertical reaction devices,and commonly includes the load/stack platform and the anchor pile reaction device.Taking Tianshui Quxi urban and rural water supply project as an example,the deformation and shear tests of rock mass of dam foundation were conducted using ground anchors to apply vertical reaction forces,verified the applicability and feasibility of cement mortar anchoring steel bars as the reaction device,and provided reference and basis for similar projects and tests.
作者
薛永平
XUE Yongping(Gansu Water Resources and Hydropower Survey and Design Institute Co.,Ltd.)
出处
《大坝与安全》
2023年第4期48-51,共4页
Dam & Safety
关键词
原位试验
竖向荷载
抗剪
变形
锚杆
in-situ test
vertical load
shear resistance
deformation
anchor bolt