期刊文献+

铝土矿特殊地段综掘壁采三机配套方案优选

Optimization of three supporting schemes for comprehensive excavation and wall mining in special sections of bauxite mines
下载PDF
导出
摘要 贵州某铝土矿是全国首次采用综合机械化开采的方式进行铝土矿开采的矿山之一。针对其开采过程中出现的矿层赋存不稳定、回采率低及设备磨蚀严重等问题,提出在铝土矿特殊地段采用掘进机械化采矿方法,并设计了三种方案。通过三种方案的主要技术特征、优缺点及投资成本对比,优化了铝土矿特殊地段综掘壁采三机配套方案。 A certain bauxite mine in Guizhou is one of the first mines in China to adopt a comprehensive mechanized mining method for mining.In order to the unstable occurrence of ore layers,low recovery rate,and severe equipment wear and tear during the mining process,providing three supporting schemes for comprehensive excavation and wall mining in special sections of bauxite mines.Comparing the three solutions,it is optimized the supporting plan for the three machines.
作者 张海涛 ZHANG Haitao(Tiandi Science&Technology Co.,Ltd.,Beijing 100013,China;CCTEG Coal Mining Research Institute,Beijing 100013,China)
出处 《中国矿业》 2023年第S02期182-185,共4页 China Mining Magazine
关键词 铝土矿 地下开采 综合机械化开采 掘进机械化采矿方法 特殊地段 bauxite mine underground mining fully-mechanized mining mechanized mining method for excavation special section
  • 相关文献

参考文献4

二级参考文献19

共引文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部