摘要 为确保2002巷安全快速过F3断层区,减少围岩破碎现象,拟对断层区围岩支护进行优化,决定采取“管棚注浆+喷射混凝土”作为临时支护,采用“钢筋网+让压锚索+π型钢棚”作为永久支护等联合支护方案。应用该优化方案后,断层区围岩应力显现现象得到明显改善,保障了巷道掘进安全。 In order to ensure the safe and rapid passage of the F3 fault area in 2002 Lane and reduce surrounding rock fragmentation,the article proposes to optimize the surrounding rock support in the fault area,adopting"pipe shed grouting and sprayed concrete"as temporary support,and using"steel mesh,pressure anchor cable andπshaped steel shed"as permanent support and other joint support schemes,which significantly improves the stress manifestation of the surrounding rock in the fault area and ensures the safety of tunnel excavation.
作者 王海江 Wang Haijiang(Fangshandianping Colliery of Lvliangshan Coal and Electricity Company,Shanxi Coking Coal Huozhou Coal and Electricity Group,Lvliang,Shanxi 033100)
出处 《江西煤炭科技》 2023年第4期87-89,92,共4页 Jiangxi Coal Science & Technology
关键词 掘进巷道 断层构造破碎区 支护优化 应用效果 excavation roadway fault structure broken area supporting optimization application effect
  • 相关文献

参考文献10

二级参考文献51

共引文献31

同被引文献11

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部