随着新型电力系统建设对调峰电源需求的增强,建设混合式抽水蓄能电站成为一项重要任务。为了更好地选择混合式抽水蓄能项目建设地点、优化混合式抽水蓄能机组选型和调度运行,笔者通过分析影响混合式抽水蓄能电站建设的关键因素,提出混合式抽水蓄能电站选点原则、水泵水轮机设计难点及调度运行重点,为后续混合式蓄能电站建设提供帮助。
With the increasing demand for peak shaving power supply in the construction of new power systems,the construction of mixed pumped storage power station has become a key task.In order to better select the construction site,optimize the selection and dispatching operation of mixed pumped storage power station,the authors analyze the key factors that affect the construction of mixed pumped storage power station,propose the principles for selecting points for mixed pumped storage power station,design difficulties for pump-turbines and the key points of the dispatching operation,which will provide help for the subsequent construction of mixed pumped storage power station.
作者
宗万波
赵良英
ZONG Wanbo;ZHAO Liangying(China Renewable Energy Engineering Institute,Beijing 100120,China)
出处
《红水河》
2023年第5期93-97,共5页
Hongshui River
关键词
混合式抽水蓄能电站
水泵水轮机
选点
调度运行
mixed pumped storage power station
pump-turbine
point selection
dispatching operation