摘要
为提高受水利工程影响测验断面推流精度,提升H-ADCP流量在线监测系统水平,以梅铺水文站为例,探讨H-ADCP在受回水顶托及上下游电站调蓄综合影响下,通过一元三点插值法建立代表流速相关关系曲线以及最小二乘法建立的多元回归模型的可行性,以及不同方式推求流量的精度和过程差异。
In order to improve the flow pushing accuracy of test section affected by hydraulic engineering and improve the level of H-ADCP flow online monitoring system,taking Meipu Hydrological Station as an example,the feasibility of establishing a representative velocity correlation curve and a multiple regression model established by the least square method through the one-yuan three-point interpolation method under the comprehensive influence of backwater top support and upstream and downstream power stations was discussed.The accuracy and process difference of flow rate estimation by different methods are also discussed.
作者
蒋四维
陶昕怡
周文静
罗成延
Jiang Siwei;Tao Xinyi;Zhou Wenjing;Luo Chengyan(Hanjiang River Bureau of Hydrology and Water resources Survey,changjiang Water Resources Commission,Xiangyang 441021,Hubei)
出处
《陕西水利》
2023年第11期33-36,共4页
Shaanxi Water Resources
关键词
H-ADCP
多元回归模型
最小二乘法
代表流速法
一元三点插值法
H-ADCP
multiple regression model
least square method
representative velocity method
one point interpolation method