摘要 结合工程实例,对钢板桩插打施工、围堰内开挖及其支撑施工要点进行探讨,并提出钢板桩施工中常见问题的应对措施,如遇到孤石、礁石时需优化施打方式、调节围堰尺寸,最后提出钢板桩围堰拆除要点。 Combined with engineering examples,this study discusses the construction of steel sheet pile,excavation in cofferdam and key points of supporting construction,and puts forward countermeasures for common problems in steel sheet pile construction,such as optimizing the construction method and adjusting the size of the cofferdam when encountering isolated stone and reef,and finally puts forward the key points of removing steel sheet pile cofferdam.
作者 李庆峰 LI Qing-feng(The fifth construction Co.Ltd.of CCCC Fourth Harbor Engineering Co.Ltd.,Fuzhou 350213,China)
出处 《工程建设与设计》 2023年第18期126-128,共3页 Construction & Design for Engineering
关键词 轨道交通 桥梁 深基坑 钢板桩围堰 技术探讨 rail transit bridge deep foundation pit steel sheet pile cofferdam technical discussion
  • 相关文献

参考文献3

二级参考文献7

共引文献13

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部