期刊文献+

桥梁维修加固作业中的同步顶升更换支座技术 被引量:2

Synchronous Jacking Replacement Support Technology in Bridge Maintenance and Reinforcement
下载PDF
导出
摘要 围绕同步顶升更换支座技术在濠江大桥工程中的应用展开研究。首先对桥梁病害进行说明,并就其产生的原因展开探讨,然后深入分析了应用同步顶升法时的注意因素、对设备的要求以及具体实施要点。施工完成后经桥梁评定可知,此次维修加固取得了良好的效果。 The paper focuses on the application of synchronous jacking replacement support technology in Haojiang Bridge project.Firstly,the bridge diseases were explained and the reasons for their occurrence were discussed.Then,the attention factors,equipment requirements,and specific implementation points when applying the synchronous lifting method were explained in depth.After the construction was completed,the bridge evaluation showed that the maintenance and reinforcement achieved good results.
作者 邓少鸿 DENG Shao-hong(Guangdong Shenshan Expressway East Section Co.Ltd.,Shantou 516081,China)
出处 《工程建设与设计》 2023年第18期163-165,共3页 Construction & Design for Engineering
关键词 桥梁工程 悬臂梁桥 同步顶升 支座 监测 bridge engineering cantilever beam bridge synchronous jacking support monitoring
  • 相关文献

参考文献4

二级参考文献8

共引文献7

同被引文献12

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部