摘要
基于光伏发电项目探索有效的项目进度管理策略,论文结合光伏发电项目的一般情况,系统地总结和分析了光伏发电项目进度管理的关键要素和方法,提出光伏发电项目的进度管理需要综合考虑工程进度计划编制、施工工序安排、进度监测与报告等关键环节,以及风险应对和延期分析等项目控制手段。
This paper explores effective project schedule management strategies based on photovoltaic power generation projects.Based on the general situation of photovoltaic power generation project,it systematically summarizes and analyzes the key elements and methods of the photovoltaic power generation project schedule management,and proposes that the schedule management of photovoltaic power generation projects should comprehensively consider the key links such as project schedule planning,construction process arrangement,progress monitoring and reporting,as well as project control means such as risk response and delay analysis.
作者
黄隆夏
HUANG Long-xia(Guohua Energy Investment Co.Ltd.,Beijing 100000,China)
出处
《工程建设与设计》
2023年第18期214-216,共3页
Construction & Design for Engineering
关键词
光伏发电
项目进度管理
管理方法
)photovoltaic power generation
project schedule management
management methods