摘要
路桥工程是建筑业的一大板块,近年来,随着国家对基础设施的大力发展,许多道路桥梁相继被设计建设,而随着路桥工程逐步发展,工程项目体量逐步增大,超长桩施工逐步被广泛应用,从而产生很多问题,不利于施工进度及安全质量。故文章主要针对湿陷性黄土地区超长桩出现的问题进行分析,并提出具有针对性的解决措施,希望通过本文对湿陷性黄土地区超长桩施工存在问题的分析,能为湿陷性地区桩基施工提供参考,进而使施工得到更加有序地进行。
Road and bridge engineering is a large section of the construction industry.In recent years,With the country's aggressive development of infrastructure,many roads and Bridges have been designed and built.However,with the gradual development of road and bridge engineering,the project volume is gradually increased,and the construction of ultra-long pile is gradually widely used,which causes many problems and is not conducive to the construction schedule and safety quality.So,this paper mainly analyzes the problems of ultra-long pile in collapsible loess area and puts forward targeted measures to solve them.It is hoped that the analysis of existing problems of ultra-long pile construction in collapsible loess area in this paper can provide reference for pile foundation construction in collapsible loess area,so that the construction can be carried out more orderly.
作者
韩婷婷
刘欣
Han Tingting;Liu Xin(SCEGC Machanized Construction Group Company.Ltd,Xi’an 710032)
出处
《陕西建筑》
2023年第9期6-11,共6页
Shaanxi Architecture
关键词
湿陷性黄土
超长桩
施工
现场问题
对策
Collapsible loess
Super-long pile
Construction
Field problems
countermeasure