摘要
该文基于某码头预制构件预制与安装工程,分析相应的构件预制工艺、涉及的质量控制要点,以及构件安装施工流程,并分析相应的质量控制措施。在码头预制构件的预制及安装过程中,需要工作人员针对不同构件的实际情况,做好相应的质量控制工作,合理控制预制流程,选用适宜的安装方法,严格控制预制质量和施工质量,以提升码头总体施工效果。
Based on the prefabrication and installation engineering of prefabricated components at a certain dock,this paper analyzes the corresponding prefabrication process,quality control points involved,and construction process of component installation,and analyzes the corresponding quality control measures.In the process of prefabrication and installation of prefabricated components at the dock,it is necessary for staff to carry out corresponding quality control work based on the actual situation of different components,reasonably control the prefabrication process,select suitable installation methods,strictly control the prefabrication quality and construction quality,in order to improve the overall construction effect of the dock.
出处
《科技创新与应用》
2023年第32期157-160,共4页
Technology Innovation and Application
关键词
码头预制构件
钢筋工程
混凝土
质量控制
工艺流程
prefabricated components of the dock
reinforcement works
concrete
quality control
technological process