摘要 本文针对某大型水电站10 kV厂用电系统保护装置中存在对时异常的现象,分析其根本原因是每套10 kV保护装置上分配的对时信号较弱,容易丢失,为此提出了增强保护装置对时信号的优化方法。将每段10 kV母线上的保护装置由2路对时信号线改为4路,并对信息网络柜内电B码对时端子排上的接线优化布置,使授时源均匀引接至各段10 kV母线开关柜,有效抑制对时异常缺陷的发生,从源头消除了此类缺陷。 Abnormal time synchronization fault is observed in the protection equipment of the 10 kV auxiliary power system in a large-scale hydropower station.Analysis shows that the fundamental reason is that the timing signal allocated to each 10 kV protection equipment is rather weak and easy to lose.Thus,an optimization method to enhance the timing signal of the protection equipment is proposed.The protection equipment on each section of the 10 kV busbar is renovated from 2 timing signal lines to 4 lines.The wiring of the IRIG-B code timing terminal strip in the information network cabinet is optimized to evenly connect the timing source to the switch cabinet of each section of the busbar.The proposed measures effectively suppress the occurrence of the timing synchronization fault and eliminate such problem from the origin.
作者 王子文 王龙辉 童志祥 孙远刚 WANG Ziwen;WANG Longhui;TONG Zhixiang;SUN Yuangang(Wudongde Hydropower Plant,China Yangtze Power Co.,Ltd.,Luquan 651512,China)
出处 《水电与新能源》 2023年第10期46-48,共3页 Hydropower and New Energy
关键词 保护装置 对时异常 优化方案 protection equipment abnormal time synchronization optimization scheme
  • 相关文献

参考文献4

二级参考文献18

共引文献144

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部