摘要 针对柬埔寨达岱河水电站工程实际,借鉴以往类似工程经验,通过在导流洞与大坝帷幕灌浆交汇处增补与加强固结灌浆,并使导流洞封堵段的灌浆帷幕与大坝防渗帷幕有效连接;在导流洞封堵体混凝土中预埋高密聚乙烯冷却水管通水冷却,避免了水化热引起温度裂缝的产生;对主坝导流洞封堵的设计方案、施工组织设计进行了认真的研究与精心实施,使整个封堵过程进展顺利,封堵效果良好。 The design and construction of the diversion tunnel plugging work of the main dam in Tatay Hydropower Station in Cambodia are introduced.Considering the actual situation of the project and the experience of previous similar work,consolidation grouting is added and strengthened at the intersection of the curtain grouting of the diversion tunnel and the dam to effectively connect the grouting curtains of the plugging section of the diversion tunnel and the dam body.High density polyethylene pipes are embedded in the plug concrete for water cooling,which can avoid the occurrence of temperature cracks caused by hydration heat.Then,the design scheme and construction organization of the diversion tunnel plugging work are carefully studied and implemented,which ensures the smooth progress of the entire work and a good plug performance.
作者 屈文奇 QU Wenqi(China Gezhouba Group No.1 Engineering Co.,Ltd.,Yichang 443002,China)
出处 《水电与新能源》 2023年第10期60-63,共4页 Hydropower and New Energy
关键词 柬埔寨达岱河水电站 主坝导流洞 封堵 设计 施工 Tatay Hydropower Station in Cambodia diversion tunnel plugging design construction
  • 相关文献

参考文献1

二级参考文献5

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部