期刊文献+

某水库泄洪洞临时堵头封堵施工方案

Construction Scheme of Temporary Plug Plugging for Spillway Tunnel of a Reservoir
原文传递
导出
摘要 结合水库除险加固实际情况,对泄洪洞临时堵头封堵施工技术展开研究。制定的施工工序主要包括施工准备、作业面清理、浆砌石砌筑、C20混凝土浇筑、回填灌浆、聚氨酯砂浆封堵6步。实际施工环节,应当严格根据施工工艺的各项要求完成施工作业,力求保障每个工序的施工质量,从而保障最终的施工效果。 Based on the actual situation of reservoir hazard removal and reinforcement,the construction techonology for temporary plug plugging of the spillway tunnel is briefly analyzed.The developed construction procedures mainly include construction preparation,site clearance,masonry construction with mortar,pouring of C20 concrete,backfill grouting,and sealing with polyurethane mortar,totaling six steps.During the construction process,construction shall be carried out in strict accordance with the requirements of construction technology to ensure the construction quality of each process,so as to ensure the final construction effect.
作者 黄锐彬 HUANG Ruibin(Guangdong Dayu Water Conservancy Construction CO.LTD.,Shantou 515100,China)
出处 《河南水利与南水北调》 2023年第8期65-66,共2页 Henan Water Resources & South-to-North Water Diversion
关键词 水库 泄洪洞 临时封堵 施工方案 reservoir spillway tunnel temporary plugging construction plan
  • 相关文献

参考文献1

二级参考文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部