南北方超深特大型水池工程实践与对比分析 被引量:1

Based on the Field Pumping Test after the Construction of Sealing Structure
下载PDF
导出
摘要 随着我国特大型水池、污水处理厂、游泳池的广泛应用,在南方、北方建设特大型蓄水池,其中重点难点在于项目内设超深超大试验水池,主要用于功能性试验,以满足保障条件为目标,实现总装、调试、试验等相关需求。通过结合实际工程,针对超深超大型水池施工的难点分析,采用必要的技术措施与施工方法,取得了良好的施工效果。 With the extensive application of large cistern,sewage treatment plant and swimming pool,the construction of large cistern in the south and the north,the key and difficulty lies in the extra-deep and extra-large test cistern,which is mainly used for functional tests,in order to meet the guarantee conditions as the goal,to achieve assembly,commissioning,testing and other related requirements.By com‐bining with the actual project,aiming at the analysis of the difficulties in the construction of super deep and super large pool,the necessary technical measures and construction methods are adopted,and good construction results are achieved.
作者 姜思宇 JIANG Siyu(Guangdong Institute of Intelligent Unmanned System(Nansha)Guangzhou 511458,China)
出处 《广东土木与建筑》 2023年第10期81-83,共3页 Guangdong Architecture Civil Engineering
关键词 特大型水池 变形控制 施工流程 关键技术 extra-large pool deformation control construction process key technology
  • 相关文献

参考文献8

二级参考文献77

共引文献16

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部