新能源光伏工程项目质量管理与项目进度控制 被引量:1

Quality Management and Project Schedule Control of New Energy Photovoltaic Engineering Project
下载PDF
导出
摘要 对新能源光伏工程项目建设管理的必要性加以分析,针对项目投资成本高,回报周期较长的特点,指出需抓好项目前期、开工以及建设阶段的质量管理,引入信息化技术与标准化规范,完善项目质量管理体系。同时,还要根据新能源光伏工程项目的实施内容和顺序制订详细的实施计划方案,明确具体的实施内容、资源与时间节点,抓好进度控制和基础保障,切实推进项目质量管理与进度管控,以提高新能源光伏工程项目后期投运的实质性效能,拓展当地新能源光伏事业的应用形态。 The necessity ofnew energy photovoltaic projeet constuction management is analyzed,in view ofthe characteristics ofhigh project investment cost and long return cycle,it is pointed out that it is ncessary to do a good job in the quality management of the early stage,start and constructionoftheproject,introduce iformationtechnology andstandardization,andimprove the projectqualitymanagement system.At the same time,it is also necessary to formulate a detailed implementation plan according to the implementation content and sequence of the new energy photovoltaic engineering project,clarify the specific implementation content,resources and time nodes,grasp the schedule control,and basic guarantee,and ffctivel prormote the project quality management and schedule control,in order to improve the substantive eficiency ofthe new energy photovotaie engineering projetin the later periodof operation,expand the pplication form of local new energy photovoltaic business.
作者 钱志坚 张留 王兵 李生华 QIAN Zhi-jian;ZHANG Liu;WANG Bing;LI Sheng-hua(CSCEC Zhonghuan New Energy Co.Ltd.,Nanjing 210006,China)
出处 《工程建设与设计》 2023年第20期213-215,共3页 Construction & Design for Engineering
关键词 新能源光伏工程 项目质量管理 项目进度控制 new energy pv engineering project quality management project schedule control
  • 相关文献

参考文献3

二级参考文献14

共引文献10

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部