机电安装单位在设计变更频繁下的管理策略

MANAGEMENT STRATEGY OF MECHANICAL AND ELECTRICAL INSTALLATION UNIT UNDER FREQUENT DESIGN CHANGES
下载PDF
导出
摘要 面对边设计边施工的项目,由于各种原因通常会造成频繁的设计变更,为解决由此造成的项目变更管理混乱,以某精装交付住宅项目为例,在分析机电工程变更发生原因的基础上,机电安装单位针对各项变更原因提出了相应的控制策略和变更发生后的管理对策,以期为相关人员提供参考。 In the face of the design and construction projects,frequent design changes are often caused by various reasons.In order to solve the confusion of project change management caused by this,this paper takes a hardcover delivery residential project as an example,and on the basis of analyzing the causes of changes in mechanical and electrical engineering,puts forward the corresponding control strategies for the causes of changes and the management countermeasures after the changes.In order to provide reference for relevant personnel.
作者 邢晋鹏 刘文举 邵帅 丁晓亮 陈友 谢恺希 Xing Jin-peng;Liu Wen-ju;Shao Shuai;Ding Xiao-liang;Chen You;Xie Kai-xi
出处 《建筑技术开发》 2023年第11期152-154,共3页 Building Technology Development
关键词 建筑机电工程 设计变更频繁 管理策略 building mechanical and electrical engineering frequent design changes management strategy
  • 相关文献

参考文献4

二级参考文献8

  • 1全国一级建造师执业资格考试用书编写委员会.机电安装工程管理与实务[M].北京:中国建筑工业出版社,2004.
  • 2国际咨询工程师联合会,中国工程咨询协会.FIDIC合同条件--施工合同条件[M].北京:机械工业出版社,2002.
  • 3中华人民共和国建设部,国家工商行政管理局.建设工程施工合同(示范文本)(GF-1999-0201)[M].北京:兵器工业出版社.2001.
  • 4全国造价工程师执业资格培训教材编审委员会.工程造价计价与控制[M].北京:中国计划出版社,2006.
  • 5注册咨询工程师(投资)考试教材编写委员会.项目决策分析与评价[M].北京:中国计划出版社,2004.
  • 6中华人民共和国住房和城乡部.GB50500-2008.建设工程工程量清单计价规范[M].北京:中国计划出版社,2008.
  • 7于金辉.基于建筑智能化的电气工程设计与应用研究[J].中国住宅设施,2020(4):30-31. 被引量:7
  • 8方海兴.试论BIM技术在建筑工程设计管理中的应用效果[J].城市建筑,2021,18(6):148-150. 被引量:8

共引文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部