面对边设计边施工的项目,由于各种原因通常会造成频繁的设计变更,为解决由此造成的项目变更管理混乱,以某精装交付住宅项目为例,在分析机电工程变更发生原因的基础上,机电安装单位针对各项变更原因提出了相应的控制策略和变更发生后的管理对策,以期为相关人员提供参考。
In the face of the design and construction projects,frequent design changes are often caused by various reasons.In order to solve the confusion of project change management caused by this,this paper takes a hardcover delivery residential project as an example,and on the basis of analyzing the causes of changes in mechanical and electrical engineering,puts forward the corresponding control strategies for the causes of changes and the management countermeasures after the changes.In order to provide reference for relevant personnel.