改扩建工程中预制旧桩基再利用试验研究

Experimental Study on Reuse of Old Precast Pile Foundations in Reconstruction and Extension Project
下载PDF
导出
摘要 既有建筑在改扩建过程中产生了大量的预制旧桩基,直接拔除旧桩一方面造成资源浪费,另一方面对原状土形成扰动,对新打入预制桩承载力形成不利影响。通过某工程中预制旧桩现场试验,研究预制旧桩再利用的可行性,验证了所采取的消除挤土效应措施有效,试验结果也可为后续其他号房和车库的施工起到指导作用。 During the reconstruction and extension process of existing buildings,a large number of old precast pile foundations are generated.Directly removing the old piles not only causes resource waste,but also causes disturbance to the original soil,which has a negative impact on the bearing capacity of newly driven precast piles.Through onsite testing of precast old piles in a certain project,the feasibility of reusing old precast piles is studied,and the measures taken to eliminate soil squeezing effect are verified to be effective.The test results can also serve as guidance for the construction of other rooms and garages in the future.
作者 陈君杰 CHEN Junjie(Shanghai Construction Group Co.,Ltd.,Shanghai 200080,China)
出处 《建筑施工》 2023年第10期1947-1949,共3页 Building Construction
关键词 预制旧桩基 挤土效应 应力释放 改扩建工程 old precast pile foundation soil squeezing effect stress release reconstruction and extension projects
  • 相关文献

参考文献4

二级参考文献28

共引文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部