复杂地质条件下综采工作面大断面切眼施工及支护

Large-section Cut Construction and Support of Fully-mechanized Mining Face under Complex Geological Conditions
下载PDF
导出
摘要 为解决复杂地质条件下综采工作面大断面切眼围岩变形量大、支护困难的问题,以木瓜煤矿10201综采工作面切眼为研究对象,提出采用“二次成巷”施工工艺和“锚网索+注浆+单体支柱”的联合支护措施。现场应用效果表明:切眼过断层破碎带期间,顶底板相对移近量最大值为138.72 mm,两帮相对移近量最大值为81.62 mm,无冒顶及片帮现象发生,切眼成形效果较好。 In order to solve the problem of large deformation of surrounding rock and difficult support in the large-section cut of the fully-mechanized mining face under complex geological conditions,taking the cut of 10201 fully-mechanized mining face of Mugua Coal Mine as the research object,the combined support measures of"secondary tunneling"construction technology and"anchor net cable+grouting+single pillar"was proposed.The field application results showed that the maximum relative displacement of the roof and floor was 138.72 mm,and the maximum relative displacement of the two sides was 81.62 mm during the period when the cut passed through the fault fracture zone,there was no roof fall and wall caving,and the cut shaping effect was good.
作者 刘红波 LIU Hongbo(Mugua Coal Mine,Huozhou Coal Electricity Group,Shanxi Coking Coal Group,Fangshan 033100,Shanxi,China)
出处 《能源与节能》 2023年第11期123-125,130,共4页 Energy and Energy Conservation
关键词 综采工作面 大断面切眼 导硐扩刷 围岩控制 fully-mechanized mining face large-section cut expanding brush of guide hole surrounding rock control
  • 相关文献

参考文献6

二级参考文献34

共引文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部