大藤峡工程风险管控“六项机制”实践应用

Practical application of the“six mechanisms”for risk management and control in the Datengxia Project
下载PDF
导出
摘要 大藤峡水利枢纽工程准备期、筹建期、主体工程施工期“三期叠加”,工程建设与生产运行交织,安全风险管控难度大。分析了工程面临的主要安全风险,结合风险类型及风险管控“六项机制”要求,构建了包含查找、研判、预警、防范、处置、责任机制的大藤峡工程风险管控“六项机制”体系及安全管理平台,介绍了平台的框架及应用效果。 Datengxia Water Conservancy Hydropower Project experienced the overlapping of three periods of preparation,early-stage work and construction of main structures,and interweaving of project construction,operation and production,which resulted in challenges with risk control.The main risks associated with project safety are analyzed.Depending on the types of risks and requirements of the“six mechanisms”for risk control,a system of six mechanisms and a safety management platform are established for risk control in the Datengxia Project.The mechanisms include risk identification,judgment,early warning,prevention,treatment and accountability system.The framework and application results of the platform are also introduced.
作者 刘忠恒 张锦朝 汪登华 付宇懋 Liu Zhongheng;Zhang Jinchao;Wang Denghua;Fu Yumao
出处 《中国水利》 2023年第21期47-50,共4页 China Water Resources
关键词 大藤峡水利枢纽工程 六项机制 风险管控 安全信息化 安全预警 隐患整治 Datengxia Water Conservancy Hydropower Project six mechanisms risk control safety informatization safety early warning hidden danger mitigation
  • 相关文献

二级参考文献52

共引文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部