期刊文献+

多台塔吊交叉作业安全措施研究

Research on Safety Measures for Cross Operation of Multiple Tower Cranes
下载PDF
导出
摘要 多台塔吊在同一工地进行交叉作业时,确保安全非常重要。在进行多台塔吊交叉作业之前,必须进行详细的规划和协调,确定每个塔吊的位置、工作范围和高度,以及确保它们之间有足够的空间进行安全操作。通过BIM技术的应用,确保每个塔吊都有足够的操作空间,并避免它们之间的干扰,防止碰撞。根据现场实际工况,开展多台塔吊交叉作业安全措施研究,提高塔吊作业效率和质量,为今后类似多台塔吊交叉作业工程提供了有效参考。 It was very important to ensure safety when multiple tower cranes ware operating at the same site.Before a multi-crane crossing operation,detailed planning and coordination must be carried out to determine the location,working range and height of each tower crane,as well as to ensure that there was sufficient space between them for safe operation.Through the application of BIM technology,it was ensured that each tower crane has sufficient operating space,and interference between them was avoided to prevent collision.According to the actual working conditions on site,research on safety measures for cross operation of multiple tower cranes was carried out to improve the efficiency and quality of tower cranes,which provides an effective reference for similar cross operation projects of multiple tower cranes in the future.
作者 方铭海 FANG Ming-hai(Fujian Provincial Erjian Construction Group Corp.Ltd.,Fuzhou 350001,China)
出处 《价值工程》 2023年第32期48-50,共3页 Value Engineering
关键词 多台塔吊 交叉作业 防碰撞 BIM技术 安全措施 multiple tower cranes cross operation anti collision BIM technology safety measures
  • 相关文献

参考文献5

二级参考文献26

共引文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部