期刊文献+

小断面长隧洞开挖支护施工难点分析

Analysis of Difficulties in Excavation and Support Construction of Small Section Long Tunnel
下载PDF
导出
摘要 随着水资源配置工程建设发展趋势,输水工程中小断面长隧洞工程越来越多,小断面隧洞施工由于受断面大小影响,操作空间受限,对于土石方开挖运输效率存在极大影响.根据不同断面尺寸及形式,制定不同的施工方案,有针对性地采取施工方法,有利于工程施工安全、质量及进度目标得以实现. With the development trend of water resource allocation engineering construction,there are more and more small cross-section long tunnel projects in water transmission engineering.The construction of small cross-section tunnels is greatly affected by the size of the cross-section and the limited operating space,which greatly affects the efficiency of earthwork excavation and transportation.Developing different construction plans based on different cross-sectional dimensions and forms,and adopting targeted construction methods,is conducive to achieving the safety,quality,and progress goals of engineering construction.
作者 代典 李卓 DAI Dian;LI Zhuo(Guangzhou Xinzhu Engineering Supervision Co.,Ltd,Guangzhou 510610,China)
出处 《云南水力发电》 2023年第11期169-173,共5页 Yunnan Water Power
关键词 小断面 长隧洞 开挖 支护 small section long tunnel excavation support
  • 相关文献

参考文献3

二级参考文献4

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部