环境敏感区大方量花岗岩非爆破开挖技术

Non-blasting Excavation Technology for Large Volume Granite in Environmentally Sensitive Area
下载PDF
导出
摘要 缙云抽水蓄能电站地面开关站为一级建筑物,开挖后边坡高度41.3 m,地形上陡下缓,上、下游两侧发育常年流水冲沟,覆盖层较厚,岩石多为强~弱风化钾长花岗岩.清泉山庄多栋建筑物紧邻开关站,同时,开关站边坡设计开口线以上存在多处孤石,若采用传统的钻爆法施工,钻爆作业产生的飞石、粉尘、有害气体、爆破震动等对周边环境存在较大影响,存在较大安全隐患,为了消除传统爆破开挖带来的环保和周边建(构)筑物稳定性问题,提高边坡开挖质量,首次在抽水蓄能电站边坡开挖工程中采用无爆破切割法施工,形成适合于边坡开挖的切割施工工艺. The ground switch station of Jinyun Pumped Storage Power Station is a first-class building.After excavation,the slope height is 41.3m,and the terrain is steep above and gentle below.Perennial running water gullies are developed on both sides of the upstream and downstream,with a thick covering layer.The rocks are mostly strongly to weakly weathered potassium feldspar granite.Several buildings in Qingquan Villa are adjacent to the switching station.At the same time,there are multiple isolated stones above the opening line of the switch station slope design.If traditional drilling and blasting methods are used for construction,the flying rocks,dust,harmful gases,and blasting vibrations generated during drilling and blasting operations have a significant impact on the surrounding environment,posing significant safety hazards.In order to eliminate the environmental protection and stability issues of surrounding buildings caused by traditional blasting excavation,and improve the quality of slope excavation,the non blasting cutting method was first used in the slope excavation project of pumped storage power stations,forming a cutting construction process suitable for slope excavation.
作者 董书礼 王栋林 DONG Shuli;WANG Donglin(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
出处 《云南水力发电》 2023年第11期180-183,共4页 Yunnan Water Power
关键词 圆盘锯 绳锯 边坡开挖稳定性 废水处理 降尘 circular saw wire saw slope excavation stability waste water treatment dust fall
  • 相关文献

参考文献5

二级参考文献39

  • 1高巧君.Cu-Ti合金与金刚石(石墨)界面微区组织的分析研究[J].金属学报,1983,19(6):250-257.
  • 2.[A].王光祖.人造金刚石探秘——王光祖论文集[C].杭州:浙江大学出版社,2001..
  • 3Konstanty J. Production of diamond sawblades for stone sawing applications. Key Engineering Materials, 2003,250: 1-12.
  • 4Martin Jennings. Performance factors. Stone Industries,1988, 5:30-34.
  • 5Caveney R. 50th anniversary of the first successful diamond synthesis. Industrial Diamond Review, 2003, 63(1): 13-15.
  • 6Raal F A. The importance of bonding to diamond surfaces in industrial application. In: Proceedings of Diamond Conference. Bristol, England, 1968:485-497.
  • 7Evens D. Wetting and bonding of diamonds by copper-tintitanium alloys. Industrial Diamond Review, 1977, 37(9):306-309.
  • 8Bailey M W. Titanized metal bond diamond grit and related investigations into the sawing of stone and concrete. Industrial Diamond Review, 1978, 38(1): 8-13.
  • 9Molinari A. Study of the diamond-matrix interface in hotpressed cobalt-based tools. Materials Science & Engineering A: Structural Materials: Properties, Microstructure and Processing, 1990, A130(2): 257-262.
  • 10Konstanty J. The materials science of stone sawing. Industrial Diamond Review, 1991, 51(1): 27-31.

共引文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部