摘要 阳极组装线生产中,为了使单一组装生产线如何满足电解生产用阳极需求,分析出影响组装生产线小时产量的主要因素,从装卸站排出方式调整、钢爪抛丸机推车机改造、电解质锤击清理提升、生产工艺过程管控和运行人员优化等方面提出可行的方法和措施,实践后,组装小时产量从29组提升到45组,提升幅度56%,满足50万吨电解铝用极需求。 In the production line of anode assembly,to make a single assembly line meet the demand of anode for electrolytic production,analyze main factors that affect the hourly output of the assembly production line,and put forward feasible methods and measures from the adjustment of the discharge mode in the loading and unloading station,the transformation of the pusher of the steel claw shot blasting machine,the improvemant of the breaking and cleaning for the electrolyte hammer,the control of the production process and the optimization of the operating personnel.After practice,the hourly output of the assembly has been increased from 29 groups to 45 groups,up by 56%,thus meeting the demand for 500000 tons of electrolytic aluminum anode.
作者 穆旭平 朱建军 Mu Xuping;Zhu Jianjun(Chalco CRC Shanxi Company Limited,Xingxian 033600,China)
出处 《轻金属》 北大核心 2023年第7期28-32,共5页 Light Metals
关键词 组装生产线 小时产量 设备改造提升 assembly production line hourly output equipment transformation and upgrading
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部