摘要
随着城市化进程的不断加快,社会对于排水工程的需求不断提升。排水组成部分穿越既有道路路口排水管道大多采用顶管施工,然而市政道路状况较为复杂,实际顶管施工还存在一些难点,需要施工人员对顶管施工高度重视,对施工方法进行仔细研究。本文通过对大量排水管道类似顶管施工进行研究,得出总结出顶管施工准备、管道顶进环节、测试与加固施工是顶管施工的关键工艺环节,采用系统先进的质量手段和完备的质量控制措施,能有效提高施工质量、降低施工成本。为后续类似工程的施工提供了施工经验和参考。
With the continuous acceleration of urbanization process,the demand for drainage engineering in society continuously increases.Most of the drainage pipes crossing the intersection of existing roads are constructed by pipe jacking,but the municipal road conditions are relatively complicated,and there are still some difficulties in the actual pipe jacking construction,which requires the construction personnel to attach great attention on the pipe jacking construction and carefully study the construction method.Through the research of similar pipe jacking construction,this paper summarizes the key process links of pipe jacking construction,and adopts systematic advanced quality means and complete quality control measures,which can effectively improve construction quality and reduce construction costs.It provides construction experience and reference for the construction of subsequent similar projects.
作者
杨庆亮
Yang Qing-liang(China Railway 20th Bureau Group Municipal Engineering Co.,Ltd.,Lanzhou 730030,Gansu Province,China)
出处
《建筑与装饰》
2023年第22期104-106,共3页
Construction & Decoration
关键词
市政道路
排水工程
污水管顶管技术
应用策略
质量控制
municipal road
drainage engineering
sewage pipe jacking technology
application strategy
quality control