摘要
在金沙江CB水电站水工模型试验中,泄洪闸前出现了偶发的贯穿性漩涡,为了消除该漩涡,对已有的一种垂向消涡栅进行了改进,并提出了一种新的横向消涡栅,试验测量了该型消涡栅的闸前流场、漩涡尺度、漩涡产生频率等参数,并分析了其消涡效果。结果表明,本文所提出的横向消涡栅相较以往的垂向消涡栅有更好的消涡效果,是一种成本低廉、高效的泄洪闸消涡设施。
In the hydraulic model test of the CB hydroelectric station in Jinsha River,occasional penetrating vortexes were observed in front of the sluice gate.In order to eliminate the vortex,this paper improved a vertical eddy-eliminating barries and proposed a new horizontal eddy-eliminating barries.The flow field in front of the sluice gate,vortex scale,and vortex generation frequency of the new horizontal eddy-eliminating barries were measured and analyzed for its vortex elimination effect.The results show that the proposed horizontal eddy-eliminating barries has better vortex elimination effect than the previous vertical eddy-eliminating barries,and it is a low-cost and efficient vortex elimination facility for sluice gate.
作者
岳振
陈海坤
田忠
YUE Zhen;CHEN Hai-kun;TIAN Zhong(State Key Laboratory of Hydraulics and Mountain River Engineering,Sichuan University,Chengdu 610065,China;POWERCHINA Guiyang Engineering Corporation Limited,Guiyang 550081,China)
出处
《水电能源科学》
北大核心
2023年第10期200-203,共4页
Water Resources and Power
基金
国家自然科学基金重点项目(51939007)。
关键词
泄洪闸
立轴漩涡
模型试验
横向消涡栅
垂向消涡栅
sluice gate
vertical vortex
model test
horizontal eddy-eliminating barriers
vertical eddy-eliminating barries