综采工作面支架快速回撤新工艺的实践研究 被引量:1

Practical Research on the New Process of Rapid Withdrawal of Support in Fully Mechanized Mining Face
下载PDF
导出
摘要 鲍店煤矿工作面支架原回撤工艺存在回撤效率慢、工作人员多、劳动强度大等问题,支架回撤影响工作面回撤进度,以液压支架调移装置和单轨吊机车设备为基础,设计支架快速回撤新工艺,并在5312工作面进行实践应用。结果表明:支架回撤仅用12 d完成,大幅度提高了回撤效率,节省费用35万元,安全经济效益显著。 The original withdrawal process of the support in the working face of Baodian Coal Mine has problems such as slow withdrawal efficiency,large number of workers,and high labor intensity.The withdrawal of the support affects the withdrawal progress of the working face.Based on the hydraulic support adjustment device and monorail crane locomotive equipment,a new rapid withdrawal process of the support is designed and applied in practice on the 5312 working face.The results show that the support withdrawal is completed in only 12 days,significantly improving the withdrawal efficiency,saving 350,000 yuan in costs,and achieving significant safety and economic benefits.
作者 郭延强 Guo Yanqiang(Yankuang Energy Group Co.,Ltd.Comprehensive Machinery Installation and Demolition Center,Shandong Zoucheng 273500)
出处 《山东煤炭科技》 2023年第11期20-23,共4页 Shandong Coal Science and Technology
关键词 综采工作面 液压支架 快速回撤 调移装置 单轨吊 fully mechanized mining face hydraulic support rapid withdrawal adjustment device monorail crane
  • 相关文献

参考文献7

二级参考文献33

共引文献17

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部