陈蛮庄煤矿3602工作面突水分析及防治水措施 被引量:2

Analysis and Water Prevention and Control Measures of Water Inrush in the 3602 Working Face of Chenmanzhuang Coal Mine
下载PDF
导出
摘要 3602工作面开采过程中出现突水,为了分析工作面突水原因,通过对近露头煤柱留设情况及底板三灰岩层富水情况分析,并基于矿山压力理论,得出工作面涌水增加是停采导致底板破坏深度增大引起的。根据当前出水情况,提出了底板注浆加固、留设防水煤柱、疏水降压以及井下水害探测等防治水措施,确保工作面安全开采。 During the mining process of the 3602 working face,water inrush occurred.In order to analyze the causes of water inrush in the working face,by analyzing the retention situation of coal pillars near the outcrop and the water rich situation of the floor three limestone layers,and based on the theory of mine pressure,it is concluded that the increase in water inrush in the working face is caused by the increase in the depth of the floor failure caused by the cessation of mining.According to the current water outflow situation,measures for water prevention and control are proposed,such as floor grouting reinforcement,retaining waterproof coal pillars,water drainage and pressure reduction,underground water hazard detection,and so on to ensure safe mining of the working face.
作者 秦道霞 董绪峰 曹逸宁 Qin Daoxia;Dong Xufeng;Cao Yining(Shandong Heze Shanxian Energy Co.,Ltd.,Shandong Heze 274300;School of Resources,Shandong University of Science and Technology,Shandong Tai'an 271000)
出处 《山东煤炭科技》 2023年第11期144-148,共5页 Shandong Coal Science and Technology
关键词 工作面 突水原因 底板破坏深度 防水煤柱 防治水措施 working face cause of water inrush floor failure depth waterproof coal pillar water prevention and control measure
  • 相关文献

参考文献7

二级参考文献65

共引文献67

同被引文献5

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部