摘要
风电运维管理的好坏直接影响风机的可利用率,对风电机组按计划合理进行运维与检修保养,可以确保设备在良好的环境下运行,大幅度提高运行寿命,创造出更大的价值。通过调研,甘肃省风电场多建于2010年左右,都是老机型,面临性能大幅度降低、改造升级、更新换代的问题,为达双碳目标,未来对风电建设与运维行业的需求量非常大,需要各方的共同努力。
The operation and maintenance management quality of wind power projects will directly affect the availability of wind turbines.Rational operation,maintenance and repair of wind turbine units as planned can ensure the equipment operates in good conditions and greatly improve the operation life and create greater value.Field investigation shows that most of the wind farms in Gansu Province were constructed around 2010.The wind turbine units are old models,which are of various problems such as significant performance degradation and urgent need for renovation and upgrading.In order to realize the carbon peaking and carbon neutrality targets,the demand for wind power construction,operation and maintenance will be tremendous in the future,which requires the joint effects of all parties.
作者
张秀林
ZHANG Xiulin(Gansu Open University,Lanzhou 730050,China)
出处
《水电与新能源》
2023年第11期24-27,共4页
Hydropower and New Energy
基金
一般项目,可再生能源后期运维产业发展研究(2022-YB-01)。
关键词
风电运维
运维需求
实地调研
wind power operation and maintenance
requirements in operation and maintenance
field investigation and research