期刊文献+

Optimal scheduling strategy for virtual power plants based on credibility theory 被引量:4

原文传递
导出
摘要 The virtual power plant(VPP)is a new and efficient solution to manage the integration of distributed energy resources(DERs)into the power system.Considering the unpredictable output of stochastic DERs,conventional scheduling strategies always set plenty of reserve aside in order to guarantee the reliability of operation,which is too conservative to gain more benefits.Thus,it is significant to research the scheduling strategies of VPPs,which can coordinate the risks and benefits of VPP operation.This paper presents a fuzzy chance-constrained scheduling model which utilizes fuzzy variables to describe uncertain features of distributed generators(DGs).Based on credibility theory,the concept of the confidence level is introduced to quantify the feasibility of the conditions,which reflects the risk tolerance of VPP operation.By transforming the fuzzy chance constraints into their equivalent forms,traditional optimization algorithms can be used to solve the optimal scheduling problem.An IEEE 6-node system is employed to prove the feasibility of the proposed scheduling model.Case studies demonstrate that the fuzzy chance strategy is superior to conservative scheduling strategies in realizing the right balance between risks and benefits.
出处 《Protection and Control of Modern Power Systems》 2016年第1期48-55,共8页 现代电力系统保护与控制(英文)
基金 supported by the National Natural Science Foundation of China(No.51577115).
  • 相关文献

参考文献3

二级参考文献36

共引文献987

同被引文献54

引证文献4

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部