四川省水电工程移民安置竣工验收关键问题及对策研究

Research on Key Problems and Countermeasures of the Completion Acceptance of Hydropower Project Resettlement in Sichuan Province
下载PDF
导出
摘要 聚焦于四川省水电工程移民安置竣工验收规程规范和工作实践,全面梳理了移民安置竣工验收过程中存在的主要问题,筛选出制约移民安置竣工验收的关键问题,并有针对性的提出了处理建议。研究成果对于推进四川省乃至全国水电移民安置竣工验收工作思路提供了一定的实践经验参考与借鉴。 Focusing on the regulations and work practices of the completion acceptance of hydropower project resettlement in Sichuan Province,this paper comprehensively sorts out the main problems existing in the process of completion acceptance of hydropower project resettlement,screens out the key problems restricting the completion acceptance of hydropower project resettlement,and puts forward relevant treatment suggestions.The research results provide some practical experiences and reference for promoting the completion acceptance of hydropower resettlement in Sichuan Province and even the whole country.
作者 郑萍伟 崔洪梅 石昕川 李家明 ZHENG Pingwei;CUI Hongmei;SHI Xinchuan;LI Jiaming(PowerChina Chengdu Engineering Corporation Limited,Chengdu 610072,Sichuan,China)
出处 《水力发电》 CAS 2023年第12期11-15,45,共6页 Water Power
关键词 水电工程 移民安置 竣工验收 关键问题 对策 四川省 hydropower project resettlement completion acceptance key problem countermeasures Sichuan Province
  • 相关文献

参考文献8

二级参考文献47

共引文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部