强透水性砂层大直径深长桩塌孔处理技术

Collapsed-bore Treatment Technology of Large Diameter and Deep Long Pile in Highly Permeable Sand Layer
下载PDF
导出
摘要 基于渭河公轨合建特大桥桩基施工在钻进、钢筋笼下放过程中或完毕时塌孔等问题的应对处理技术,对所处强透水性砂层地质条件下大直径深长桩塌孔进行了原因分析、处理方案优选与实施。对于塌孔内无钢筋笼的桩位采用回填质量比为1∶10的水泥黏土混合物静置半月以上,重新进行钻孔施工;塌孔内仍有钢筋笼的桩位采用小口径钻头钻进并进行洗孔,拔笼后再成桩;钢筋笼确难拔出的采用冲击钻重新成孔。 Based on the countermeasures and treatment technologies for the collapsed-bore of pile foundation engineering of Weihe highway rail joint super major bridge during drilling,reinforcement cage lowering or completion,the causes analysis,treatment scheme optimization and implementation are carried out for the collapsed-bore of large-diameter deep and long piles in the geological conditions of strong permeable sand layer.For the pile position without reinforcement cage in the collapsed-bore,backfill cement clay mixture with mass ratio of 1:10 and leave it for more than half a month,and then carry out the drilling construction again;For the pile position with reinforcement cage in the collapsed-bore,use a smaller-diameter drill bit to drill and flush the drill hole,and then drill after pulling out the cage;If it is really difficult to pull out the reinforcement cage,the impact drill should be used to form a bore.
作者 杨超 王晓龙 陈忠锋 余洋林 赵俊杰 荣学文 YANG Chao;WANG Xiao-long;CHEN Zhong-feng;YU Yang-lin;ZHAO Jun-jie;RONG Xue-wen(Shaanxi Construction Engineering Group Co.,Ltd.,Xi′an,Shaanxi 710016,China;Xi′an Rail Transit Group Co.,Ltd.,Xi′an,Shaanxi 710008,China;Shaanxi Integrity Engineering Research Institute of Road and Bridge Co.,Ltd.,Xi′an,Shaanxi 710086,China)
出处 《黑龙江交通科技》 2023年第11期94-97,共4页 Communications Science and Technology Heilongjiang
关键词 强透水性砂层 大直径深长桩 塌孔处理 highly permeable sand layer large diameter and deep long pile collapsed-bore treatment
  • 相关文献

参考文献12

二级参考文献69

共引文献62

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部