设计、采购和施工总承包(EPC)建设模式在工程中的应用

Application of the EPC General Contracting Project In Construction
下载PDF
导出
摘要 结合公路工程建设,详细分析了设计、采购和施工总承包(EPC)合同的特点。提出了在工程实施阶段,发包人引起工期延误、承包人引起工期延误、异常恶劣气候条件、暂停工作、质量检查、清除不合格工程等情况下,以及在后期验收与责任处理阶段,交工验收和竣工验收、定义缺陷与保修等情况下,EPC合同的具体应用,为公路建设参考。 The essay combines the highway engineering construction to analyze the features of the EPC(Engineering Procurement Construction)contract in detail.It proposes the specific application of the EPC(Engineering Procurement Construction)contract to consult the highway engineering construction.How to handle in different periods such as:at the engineering implementation stage if the situation is:construction delay caused by the employer;construction delay caused by the contractor;abnormally bad weather conditions;the suspension of work;quality inspection;to remove the non-confirming or unqualified engineering,as well as in the post acceptance and the responsibility-handling period,the situations such as:project checking and accepting;completion acceptance;defects of definition;maintenance guarantee.It provided the solution,application and reference to the highway construction in different situations and periods.
作者 张洪东 刘泽华 ZHANG Hong-dong;LIU Ze-hua(Huadong Engineering Corporation Limited,Hangzhou,Zhejiang 311122,China)
出处 《黑龙江交通科技》 2023年第11期183-184,F0003,共3页 Communications Science and Technology Heilongjiang
关键词 EPC 招投标 责任制度 EPC(Engineering Procurement Construction) bidding responsibility system
  • 相关文献

参考文献3

二级参考文献4

共引文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部