期刊文献+

工业UPS并机系统输出隔离变压器接地探究

Research on Grounding of Output Isolation Transformer of Industrial UPS Parallel System
下载PDF
导出
摘要 随着电力系统的迅猛发展,UPS电源在工业控制运用中供电质量等要求变得越来越高。而UPS系统的接地方式直接影响系统的供电质量,有待制定可行的UPS接地方案,可以提高UPS供电的可靠性,也可为减少UPS故障频次,这样大大减少了设备故障带来的损失。文章对工业UPS并机系统输出隔离变压器接地进行探究,总结出适合工程应用的接地方案。 With the rapid development of the power system,the requirements for UPS power supply quality in industrial control applications have become increasingly high.The grounding method of the UPS system directly affects the power supply quality of the system.A feasible UPS grounding plan needs to be developed,which can improve the reliability of UPS power supply and reduce the frequency of UPS faults,greatly reducing the losses caused by equipment failures.This paper explores the grounding of output isolation transformer of industrial UPS parallel system,and summarizes the grounding scheme suitable for engineering application.
作者 薛磊 XUE Lei(Shaanxi Yanchang Zhongmei Yulin Energy and Chemical Co.,Ltd.(YECC),Yulin 718500,China)
出处 《化工管理》 2023年第34期125-128,共4页 Chemical Engineering Management
关键词 UPS接地 UPS供电 并机 冗余 UPS grounding UPS power supply parallel operation redundance
  • 相关文献

参考文献6

二级参考文献16

  • 1王钢,丁茂生,李晓华,廖志伟.电力自动化系统UPS供电方案可靠性[J].电力系统自动化,2005,29(3):40-44. 被引量:19
  • 2张勤.可靠性评估中随机模拟的精度控制[J].电力系统自动化,1996,20(4):29-30. 被引量:7
  • 3姚李孝,张东正.供电系统可靠性估计[J].电力系统自动化,1996,20(8):22-25. 被引量:8
  • 4GB 50174-2008.电子信息系统机房设计规范[S].
  • 5SINGH C, PATON A D. Reliability Evaluation of Emergency and Standby Power Systems. IEEE Trans on Industry Applications, 1985, 21(2): 476-480.
  • 6SINGH C, GUBBALA N. Reliability Analysis of Electric Supply Including Standby Generators and an Uninterruptible Power Supply System. IEEE Trans on Industry Applications,1994, 30(5): 1298-1302.
  • 7SINGH C, MITRA J. Reliability Analysis of Emergency and Standby Power Systems. IEEE Industry Applications Magazine,1997,3(5):41-47.
  • 8MIL-HDBK-217E, Reliability Prediction of Electric Equipment. USA: Department of Defense, 1986.
  • 9MELO A C G, PEREIRA M V F. Sensitivity Analysis of Reliability Indices with Respect to Equipment Failure and Repair Rates. IEEE Trans on Power Systems, 1995, 10(2):1014-1021.
  • 10余继珍,张悦,张晓华.电力系统用不间断电源方案的探讨与应用[J].电力系统通信,2011,32(9):74-78. 被引量:14

共引文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部