期刊文献+

大型公共建筑工程中机电设备安装工程施工技术与管理创新研究——以白云国际会议中心二期项目为例 被引量:7

Research on Construction Technology and Management Innovation of Electromechanical Equipment Installation Engineering in Large-scale Public Building Engineering—Taking Baiyun International Conference Center Phase II Project as an Example
下载PDF
导出
摘要 文章以白云国际会议中心二期项目为例,在国内外对项目机电安装理论文献研究及综合分析的基础上,结合白云国际会议中心二期机电安装工程的特点,提出了大型公共建筑工程机电安装创新技术应用和施工管控策略,旨在实现项目深化设计与施工落地的完美衔接。 Taking Baiyun International Conference Center phase II project as an example,based on the literature research and comprehensive analysis of the electromechanical equipment installation theory of the projects at home and abroad,combined with the characteristics of Baiyun International Conference Center phase II electromechanical equipment installation engineering,this paper puts forward innovative technology applications and construction control strategies of electromechanical equipment installation in largescale public building engineering,aiming at realizing the perfect connection between project deepening design and construction implementation.
作者 李汶芊 LI Wenqian(Guangzhou Yuexiu Huacheng Real Estate Development Co.,Ltd.,Guangzhou 510000,Guangdong,China)
出处 《工程技术研究》 2023年第18期216-218,共3页 Engineering and Technological Research
关键词 机电安装工程 大型公共建筑工程 施工管控 electromechanical equipmnet installation engineering large-scale public building engineering construction control
  • 相关文献

参考文献4

二级参考文献20

共引文献53

同被引文献33

引证文献7

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部