摘要
受钢铁市场低迷影响,炼铁厂6号高炉焖炉停产,随着外部市场变化,在焖炉12 d后复产,经过精心组织,参数调整,实现了高炉长期焖炉后快速达产。重点从送风前准备、装料工作、开炉操作三个方面对6号高炉长期焖炉后快速开炉达产实践过程予以阐述,并进行经验总结,以期为同类企业高炉生产提供借鉴。
Due to the downturn in the steel market,the No.6 blast furnace of the ironmaking plant was shut down for soaking.With changes in the external market,it resumed production after 12 days of soaking.After careful organization and parameter adjustment,the blast furnace quickly reached production after long-term soaking.This article comprehensively elaborates on the practical process of rapid start-up and production of No.6 blast furnace after long-term soaking from prepartion before blowing-in,loading start-up.and summarizes the experience,in order to provide reference for similar enterprises in blast furnace production.
作者
王宏伟
Wang Hongwei(Iron Making Plant of Laiwu Branch of Shandong Iron&Steel Co.,Ltd.,Jinan Shandong 271104,China)
出处
《山西冶金》
CAS
2023年第10期137-140,145,共5页
Shanxi Metallurgy
关键词
炼铁厂
焖炉
开炉操作
ironmaking plant
stewing furnace
furnace opening operation