期刊文献+

EPC项目电气设计各阶段注意事项探究

Discussion on Electrical Design of Typical Medical Places
下载PDF
导出
摘要 以医疗、教育建筑为例,以设计流程为主线,剖析了EPC项目各个设计环节中电气设计的注意事项,提出可研阶段把握设备参数的编写,设计阶段与造价专业配合、避免漏项,以及在电气设计过程中节省造价,施工服务过程中处理各方的修改意见等建议,并用项目实例介绍了配电房的选址对项目造价的影响,提出了配电房“小容量、多布点”的设计理念。 This paper takes medical and educational buildings as examples,takes the design process as the main line,and analyzes the precautions ofelectrical design in each design link ofEPC projects,and gives personal suggestions on how to grasp the preparation ofequipment parameters in the feasibility study stage,how to cooperate with the cost specialty in the design stage,how to avoid missing items,how to save the cost in the electrical design process,and how to deal with the revision opinions of all parties in the construction service process,and introduces the influence ofthe location ofpower distribution room on the project cost with project examples,and puts forward the design concept of"small capacity and multiple distribution points"for power distribution room.
作者 杨林 YANG Lin(Jianke Architectural Design Institute of Guangdong Province Co.Ltd.,Guangzhou 510000,China)
出处 《工程建设与设计》 2023年第22期38-40,共3页 Construction & Design for Engineering
关键词 EPC项目 医疗建筑 教育建筑 电气设计环节 注意事项 EPC project medical buildings educational building electrical design link matters need attention
  • 相关文献

参考文献3

二级参考文献14

  • 1张崇涛.EPC总承包模式的风险管理[J].建筑管理现代化,2004,18(3):12-14. 被引量:58
  • 2孟宪海,赵启.EPC模式下业主和承包商的风险分担与应对[J].国际经济合作,2004(12):45-46. 被引量:31
  • 3王伍仁,罗能钧.从EPC工程总承包看大型建筑业企业的成长路径[J].建筑经济,2006,27(1):34-38. 被引量:13
  • 4Hastak M, Shaked A. ICRAM-I: model for international construction risk assessment [J]. Journal of Management in Engineering, 2000, 16 (1): 59-69.
  • 5Han S H, Diekmann J E, Approaches fo" making risk-based go/no-go decision for international projects [J]. Journal of Constt'uction Engineering and Management, 2001, 127 (4) : 300-308.
  • 6Han S H, Diekmann J E. Making a risk-based bid decision for overseas construction projects [ J]. Conststruction Mana- gement and Economics, 2001, 19 (g): 765-776.
  • 7克里斯·查普曼,斯蒂芬·沃德.项目风险管理:过程、技术和洞察力[M].李兆玉,泽.北京:电子工业出版,2003.
  • 8何柏森.国际工程承包[M].2版.北京:中国建筑工业出版社.2007.
  • 9Douglas D Gransberg, Howard L Roynolds, Jack Boyd. Measuring partnered project performance [J]. Cost Engineering, 1999 (10) : 39-44.
  • 10Robet S Miles. Twenty-first century partnering and the role of ADR [J]. Jotlrnal of Management in Engineering, 1996, 12 (3): 45-55.

共引文献77

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部