期刊文献+

基于熵权模糊综合法的建筑工程造价风险管理研究 被引量:1

Research on Construction Project Cost Risk Management Based on Entropy Power Fuzzy Synthesis Method
下载PDF
导出
摘要 随着我国建筑业的蓬勃发展,建设工程项目的数量与日俱增。由于工程项目在建设过程中的诸多不可预见性,工程风险无处不在,因此将风险管理应用于造价管理中就显得尤为重要。本文从建筑工程的决策阶段、设计阶段、发承包阶段、施工阶段及竣工阶段出发,对全过程造价中存在的风险进行分析,并依据熵权模糊综合法构建风险评价模型。最后对工程实例进行风险评价,识别出了对工程造价影响的关键阶段,为建设单位进行造价风险管理提供参考。 With the booming development of China's construction industry,the number of construction projects is increasing day by day.Due to the many unpredictability of engineering projects in the construction process,engineering risks are everywhere,so it is particularly important to apply risk management in cost management.In this paper,from the decision-making stage,design stage,contracting stage,construction stage and completion stage of the construction project,we analyze the risks in the whole process of costing and construct a risk evaluation model based on the entropy weight fuzzy synthesis method.Finally,the risk evaluation of the project example identifies the key stages that have an impact on the project cost,which provides a reference for the construction unit to carry out cost risk management.
作者 李绪鹏 LI Xu-peng(Guangzhou Budget Review and Guarantee Center,Guangzhou 510080,China)
出处 《价值工程》 2023年第34期32-34,共3页 Value Engineering
关键词 建筑工程 风险管理 造价管理 熵权模糊综合法 construction risk management cost management entropy weight fuzzy synthesis method
  • 相关文献

参考文献3

二级参考文献22

共引文献33

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部